Macs Bollards

  • Increase font size
  • Default font size
  • Decrease font size

Automatic Bollards - East Dunbartonshire Council



Macs Automatic Bollards Project

No of Sites:
1
Location: Douglas Street - Milngavie
Application: Pedestrianisation
System: MACS 275/P800 Automatic Bollard
Standard: Highways Agency TR2207A




East Dunbartonshire Council required an automatic bollard system to control access into a pedestrian zone; the aim was to give controlled access in with free access out of the area. Macs Automated Bollards installed a single automatic bollard to control traffic, a camera has been installed at the bollard site and connected back to the main CCTV control centre where they are able to allow access when required with a free to exit system also in place to allow exit through the bollards back on the main highway.

As with all Macs Automated Bollard systems this project was designed with ongoing maintenance at the forefront of our plans, CCTV or VNPR are highly recommended in order to remove risks associated with collisions.

 

24/7 Support

If you have a Macs System installed then you can benefit from our Fault Monitoring and our 24 hour call out service. Just call 0161 320 6462 and speak directly to an engineer.

Macs on Twitter